
MIL'S
MIL’S SIRELLA SL100.R Dry Claw Vacuum Pump
- Electrical supply
- European version: three-phase 230/400 V, 50 Hz
- Pumping speed, 50 / 60 Hz
- 90 / 108 m³/h; PNEUROP 6602 at 20 °C
- End vacuum
- 60 mbar absolute
Girovac equipment catalogue
Compare claw vacuum pumps for industrial applications. A dry pumping chamber can be useful where the process requires this technology, but gas compatibility and operating limits still need to be checked for the selected model.
Showing 13–14 of 14 results

MIL'S

MIL'S
Use the required operating pressure and pumping capacity to narrow the options, then check gas compatibility, electrical supply and the intended duty. Include any inlet protection and discharge arrangements. For a replacement, explain how the pump is controlled and whether demand is constant or varies during production.
Dry describes the pumping chamber. Other parts of the machine may still need lubrication or scheduled maintenance. Check the selected model’s documentation before specifying it for a process with particular oil or contamination restrictions.
Suitability depends on the model, the gas and the amount and type of contamination. Describe the process and any existing separation or filtration. Do not assume a dry pumping chamber can accept liquid carry-over or unrestricted dust.
Check operating pressure, pumping capacity, supply voltage, control method and inlet and exhaust connections. Include dimensions and cooling clearances. Send the complete model reference so the replacement can be assessed against the installed equipment.
Follow the model’s service schedule, including the items specified for filtration, lubrication and inspection. Dry pumping technology does not remove all maintenance requirements. A nameplate photograph helps identify the correct parts and instructions.
Compare industrial pump technologies · Filters and separators · Workshop support
Compare continuous pressure, usable flow and maintenance needs using model-specific manufacturer references. SIRELLA or EVISA: compare the technologies.
Send the operating requirements and process details. For a replacement, include the existing model and connection.
Compare the stated conditions as well as the values. A missing specification is not a zero rating; confirm suitability with Girovac.
Copyright © 2026 Girovac Ltd | Registered in England and Wales Number: 01758137 | Cookie Policy | Privacy Policy | Delivered by Postino